Within the various activities that NRG Patagonia is qualified for, there are the following ones:

Manufacture ans assembly
of 1500 Kw turbines

Measurements
Locations and Wind Farms evaluations
Development of business models
Design and construction of Winds Farms
Operation and maintenance
of Winds Farms

Legal framework for
an eolian energy project

Environmental impact assessment
No CO2 emission quantification
Manufacture ans assembly of 1500 Kw turbines

The supply includes the complete manufacture, transfer to the site of location, installation of the wind turbine with all of its components, and start up (delivery turnkey) of the NRG 1500 turbine.
Measurements

Evaluations of the Wind Potential are performed by itself or by means of agreements with Official Organizations by using the records taken from anemometric stations installed with this purpose in the different points of interest. Using such data for a period of 6 to 12 months and performing the reanalysis of available information of the region being studied, a prediction and correlation model is applied in order to extend the series to periods of five years, wherewith a comprehensive assessment which includes average speed of the area, wind mapping by means of a three-dimensional model and an orography and wind one in order to determine the best place for the installation of the aerogenerators.

• Compass Rose graphic
• Speed media graphic
Locations and Wind Farms evaluations

Preliminary location
• Production estimate
• Technical blueprint (aerogenerators selection)
• Market
• Economic feasibility
• Superficiary agreenment (installation permit)
• Supply contract (alternative)
• Financing
• Development of business models

Evaluations


• Estimate of wind global
and particular potential of
the site (micrositing).

• Technical assessment.



• Energy production.



• Economic Indicators

Tools


• Statistical information
• Anemometric measurements.


• Conditions of the site
• Features of the different available
equipments. Selection.

• Usage coefficient calculation.
• Power curve of the wind turbine.
• Crop estimation.

• Calculation of the expected income.
• Fee incomes subsidies CER's.
• Design and construction of Winds Farms

• Infraestructure
• Assembly and put into service
• Commercialization
• Operation and maintenance of Winds Farms

• Subsequent to the putting into service it is feasible to perform
the operation and maintenance procedures to wind farms.
• Contro and statistics
• Legal framework for an eolian energy project

The wind power generation activity and its commercialization are included in the following regulatory framework, established by Law Nº 25019.

Commercial Operation and applicable standards

Alternatives:
• As a MEM (Wholesale Electricity Market) representative
• Beyond MEM.

• Law Nº25019, Regulative Decree 1597/99 (grants, deferral of VAT and fiscal stability) as well as the environmental regulations (Resolution IS 304/99) rule for both situations. Promotion norms are applicable only to production bound to supplying public service.
• Requirements to qualify for the benefit of 0.01 $/kWh: Resolution 136/00 applies, which defines the quality of measurement; allows MEM representatives (Distributors or Large Users) have wind energy generation, but not to sell their surplus to the MEM.
• Resolution IS 113/01 applies for the benefits of deferral of VAT and fiscal stability. (The benefit of fiscal stability, excludes VAT and Contributions to Social Security System).
• A minimum of one (1) MW of installed power is required to join the MEM.
• It is compared to run-of-the-river power generation.
• It is not different to other forms of generation for the provision of services.
• It enables the Agency Responsible for the Dispatch (OED) to restrict the wind energy dispatch in case the parameters have been altered out of range or the reliability of the system has been reduced.

Access to transport capacity

• Once registered as a MEM representative, access to the Carrier is requested
• The OED issues a report in this regard
• The ENRE pronounces (in case of discrepancies a Public Hearing is substanciated)
• Environmental impact assessment

Evaluations


• Environmental impact.

• Ceritified technology.

Tools


• Independent consultant.

• Independent organization
• No CO2 emission quantification

The project assessment includes the carbon dioxide (CO2) determination of the emission reduction equivalent produced by the wind energy generation in the farm or by the installed wind turbine.
  NRG 1.500 is already delivering energy to the net    NRG Patagonia will be present in Brazil Windpower 2010    NRG Patagonia finished the installation of its first equipment NRG 1.500     Transfer of the tower to the mounting site     NRG 1.500 Aerogenerator assembly completion in workshop     German technicians verified the windmill components     ENARSA inspections     The Mayor of Comodoro Rivadavia valued NRG Patagonia diversification     All the NRG Project News     News from the sector
 
     
 
 
 
News | Gallery: Videos | Images | Who we are | Contact | What we do | Join us | Where we are | Activities | NRG products
© 2009 // NRG Patagonia - All rights reserved