ENARSA inspections

As part of periodical inspections in charge of professionals from ENARSA ( Argentinian Energy S.A.) new building controls on NRG 1500 were done in the local workshop, and at the same time the verification done by foreign technicians . By the time , Controls on the final installation of the transformer of 690 volts/10400volts were done, because it is located in the mounting site of the windmill . During this activity, a member of The Ministry of Federal Planification of Argentina, from the Renewable Energies section , visited the location. This section is in charge of the pursuit of the project “ vientos de la Patagonia 1”.
  NRG 1.500 is already delivering energy to the net    NRG Patagonia will be present in Brazil Windpower 2010    NRG Patagonia finished the installation of its first equipment NRG 1.500     Transfer of the tower to the mounting site     NRG 1.500 Aerogenerator assembly completion in workshop     German technicians verified the windmill components     ENARSA inspections     The Mayor of Comodoro Rivadavia valued NRG Patagonia diversification     All the NRG Project News     News from the sector
 
     
 
 
 
News | Gallery: Videos | Images | Who we are | Contact | What we do | Join us | Where we are | Activities | NRG products
© 2009 // NRG Patagonia - All rights reserved