Design with
international
homologation


Airgenerator 1500 IEC I
view pdf
Airgenerator 1500 IEC II
view pdf
Airgenerator NRG 1500 Brochure
view pdf
DEWI certification
view
NRG Patagonia is manufacturing the first 1,500 kilowatts (1.5 Mw) turbinein the San Jorge Gulf region, on the basis of a design tested and certified at international levels for Class I wind (winds of higher intensities).

This design has a wind turbine built with identical design than the one in South Korea, which is operated by the local company Have Jin Industrial Co. Ltd., linked to NRG Patagonia since they share the design, engineering and core technology obtained in Germany for a wind turbine to be used in regions of Class II wind (of lesser intensity that the Class I wind, according to international standards).
This first equipment has been certified by the German Institute for Certifications DEWI OCC (Offshore and Certification Center GmbH). A “Statement of Compliance STC 060601, DEWI-OCC VA-01" has been issued in connection with the IEC PTE-1 standard, according to the certificate issued for the Class II model on June 19, 2006.

On September 11, 2007, NRG Patagonia obtained the DEWI Certificate Nº DEWI- OCC –ZE- 0608-37-1 (e) for the Class I model, designed for the prevailing winds in the Gulf San Jorge region,which represents a significant achievement for the regional company.
This certificate guarantees the design of each of the components of the equipment, the structural calculation, its actual operation and generating capacities.

DEWI Background

The Deutsches Windenergie-Institut GmbH (DEWI) was founded in 1990 inWilhelmshaven, Germany,by the Federal State of Lower Saxony for the purpose of supporting the wind energy industry. Since then the company has been closely involved in the rapid development of wind energy, whether in basic research, development of measuring methods, political decision-making or in numerous tasks and services connected with the realization of wind farms. (http://www.dewi.de).

  NRG 1.500 is already delivering energy to the net    NRG Patagonia will be present in Brazil Windpower 2010    NRG Patagonia finished the installation of its first equipment NRG 1.500     Transfer of the tower to the mounting site     NRG 1.500 Aerogenerator assembly completion in workshop     German technicians verified the windmill components     ENARSA inspections     The Mayor of Comodoro Rivadavia valued NRG Patagonia diversification     All the NRG Project News     News from the sector
 
     
 
 
 
News | Gallery: Videos | Images | Who we are | Contact | What we do | Join us | Where we are | Activities | NRG products
© 2009 // NRG Patagonia - All rights reserved