new
Inatallation of the first NRG 1500
Images of tashs, May 2010
Click on the image to watch the video
  Roberto Barcia, NRG Patagonia vice-president
Our company’s vision and
scope of the ongoing initiative.

Click on the image to watch the video
 
Flange Assembly / On this element, where there
will be subsequently performed the concreting
process in a concrete cage, there will be then
raised the first length of the 70 meters tower.

Click on the image to watch the video
  Simulation of the assemble and
mounting of the equipment
How the different components of
the NRG 1500 aerogenerator are built-in
.
Click on the image to watch the video
 
Transfer of the blades
With a length of 32 meters each one, they were
transferred by truck to the mounting area
of the first equipment, in the El Tordillo area.

Click on the image to watch the video
  Concreting of the foundations
This task was performed in June, 2009,
and it demanded 260 cubic meters of concrete.

Click on the image to watch the video
 
Assembly of the equipment in workshop
In this video different phases of the components
assembly can be observed, until its final test in
the testing-bench, before the mounting takes place.

Click on the image to watch the video
   
 
  NRG 1.500 is already delivering energy to the net    NRG Patagonia will be present in Brazil Windpower 2010    NRG Patagonia finished the installation of its first equipment NRG 1.500     Transfer of the tower to the mounting site     NRG 1.500 Aerogenerator assembly completion in workshop     German technicians verified the windmill components     ENARSA inspections     The Mayor of Comodoro Rivadavia valued NRG Patagonia diversification     All the NRG Project News     News from the sector
 
     
 
 
 