new Inatallation of the first NRG 1500 Images of tashs, May 2010 Click on the image to watch the video
Roberto Barcia, NRG Patagonia vice-president Our company’s vision
and
scope of the ongoing initiative. Click on the image to watch the video
Flange Assembly / On this element, where there
will be subsequently
performed the concreting
process in a concrete cage,
there will be then
raised the first length of the 70 meters tower. Click on the image to watch the video
Simulation of the assemble and
mounting of the equipment How the different components of
the NRG 1500 aerogenerator are built-in. Click on the image to watch the video
Transfer of the blades With a length of 32 meters each one, they were
transferred by truck to the mounting area
of the first equipment, in the El Tordillo area. Click on the image to watch the video
Concreting of the foundations This task was performed in June, 2009,
and it demanded 260 cubic meters of concrete. Click on the image to watch the video
Assembly of the equipment in workshop In this video different phases of the components
assembly can be observed, until its final test in
the testing-bench, before the mounting takes place. Click on the image to watch the video