Location

The location chosen to settle
the companies and to begin
the operation is:
Comodoro Rivadavia, Chubut.
Caleta Olivia, Santa Cruz.
Patagonia, República Argentina.

Central Office:
Almirante Brown 456 - 1st. floor - Office 3
9000, Comodoro Rivadavia
Phone-Fax: 54 0297 446 7848

Contact Us
1

For Manufacturing


The existence of a metalmechanic park in the Basin of the Gulf San Jorge (CR, CO, PT) suitable for the construction of mill parts. There is, for example, the Astilleros Comodoro S.A. antecedent, company that built the towers and has experience in the assembly of the turbines and keeps the equipment and machinery needed for the manufacturing in existence. In addition, professional and technical staff has participated in various working missions to Europe, achieving high technical training in the activity.

The presence of oil and gas service companies with infrastructure and equipment suitable for manufacturing mill parts either for electrical or mechanical components.

The presence in the area of staff that has participated in repairs carried out to mills located in the existing farms, allowing the incorporation of knowledge on precedent failures that will be resolved in the new turbine from the project.


2


For installation of park's


High yields of existing wind farms and availability of vacant locations in nearby areas. This “energy sale” field within its plan of action, considers the development of energy generation projects based on the localization of areas with favorable wind conditions, assessed with the technical assistance of the Wind Energy Regional Center (CREE) through cooperation agreements in force and to manage their approval by the National Department of Energy and the Department of Energy of the corresponding provinces to make use of these rights in the future. This modality allowed the European wind energy pioneering companies improve their position on the farms rights sales when business expansion began.

The existence of a regional market favorable to formalize sales to private companies with high levels of energy consumption or to electric cooperatives from Chubut or Santa Cruz, as well as official organizations that require additional sources of energy generation.

The installation of Wind Farms in Chubut Province gets a provincial reimbursement (Provincial Law Nº 4389), additional to the national reimbursement (National Law Nº 24065).

The possibility of making use of the 500 kilovolt interconnected in these high yield of wind areas, which is in its first stage of operation since April 2006

  NRG 1.500 is already delivering energy to the net    NRG Patagonia will be present in Brazil Windpower 2010    NRG Patagonia finished the installation of its first equipment NRG 1.500     Transfer of the tower to the mounting site     NRG 1.500 Aerogenerator assembly completion in workshop     German technicians verified the windmill components     ENARSA inspections     The Mayor of Comodoro Rivadavia valued NRG Patagonia diversification     All the NRG Project News     News from the sector
 
     
 
 
 
News | Gallery: Videos | Images | Who we are | Contact | What we do | Join us | Where we are | Activities | NRG products
© 2009 // NRG Patagonia - All rights reserved